PROJECT:
NOBEL MIDDLE SCHOOL
REPLACEMENT OF EXISTING HEATING AND COOLING PLANTS
Click on an image below to see a larger version.
Owner:
Los Angeles Unified School District
General Contractor:
Frederick Towers
Location:
Northridge, CA
Special Conditions:
Mechanical Piping Subcontractor, Prevailing Wage and Owner-Controlled Insurance Program
Project Description:
Suttles Plumbing provided and installed an entirely new boiler room piping system and chiller room piping system including; new chillers, boilers, flues, pumps, hot taps, natural gas piping and mechanical piping. Our crews began by disconnecting the old system and installing temporary cooling and heating systems while the work was going on to allow the interior school environment to remain comfortable for the school staff and the students. They then isolated the temporary setup from the main work area to avoid any damage to the system. After the installing all of the piping our crew chemically treated both of the systems they installed.
NEXT CASE STUDY
CASE STUDY : NOBEL MIDDLE SCHOOL